OUR WORKS

Hardening transformer TZ 7-800

Hardening transformer TZ 7-800

Read more

Reactor Induktotherm 3t repair and restoration work

Reactor Induktotherm 3t repair and restoration work

Read more

IAT inductor – 2.5 t before and after repair. Manufacturing of a new inductor IChT-2.5t

IAT inductor - 2.5 t before and after repair. Manufacturing of a new inductor IChT-2.5t Our company is engaged not only in repair and restoration work. We manufacture IChT, ITPE, ILT inductors of any complexity to order. We also manufacture non-standard equipment and accessories for them according to your requirements. We carried out a major [...]

Read more

Refractories – Burner blocks for Oil Refinery

Refractories - burner blocks for JSC "Naftan", Republic of Belarus. In 2016 a tender was announced for the supply of a batch of burner stones for an oil refinery at a maximum application temperature of 1450 C˚. Based on the results of the tender for the supply, our company offered the lowest cost with the [...]

Read more

Chamber furnace SNО 4.8.3 11

The chamber furnace SHO 4.8.3 11 was manufactured by our enterprise in two identical copies on 10.04.2018. The manufacture of the SNO chamber furnace was carried out according to the technical assignment. It was manufactured according to standards and GOSTs using new technologies (developments and innovations of our company Termolit Plus), as well as using [...]

Read more

SNO chamber resistance furnace with pneumatic mechanism

SNO chamber resistance furnace is made in a frame made of sheet material. Fibrous refractory materials are included in the lining design The power switches are manufactured using diodes and thyristors "without the use of contactors and starters", which increases durability and optimizes operation at the moment of switching. Chamber furnace SNО with pneumatic drive [...]

Read more

Induction crucible furnace IChT – 6.0 (shipment to Poltava)

The crucible induction furnace IChT - 6.0 was shipped to the plant in Poltava on February 14, 2019 The customer’s task was to perform the repair of assembly units and to manufacture new missing equipment for a complete set of the furnace. Overhaul of the IChT-6.0 furnace inductor, melting insert, magnetic circuits, and capacitor bank [...]

Read more